After we migrate and upgrade production repository from 6.5SP3 to 6.7SP2 (intermediate version) then to 7.1 (target version), during the testing of the new environment, the live production repository is still on 6.5SP3, receives more documents. When we finish the test on 7.1 we need to copy the new documents created on 6.5SP3 before go live of the new environment. Copying this delta cannot be done by dump & load as both repositories has same repository owner and repository id (if either one of them is different then only we can do dump and load between repositories).
Can you please suggest ideas about doing this delta migration with minimum downtime to production ?
Thanks
Ramy