It is a poor design. The external task that runs the deployments should have a loop that reads all attached files to the job and places them into the appropriate buckets (DCR type, deployment server, etc). You can filter DCRs by the category/type of the DCR. Put those names in 1 file and run 1 file list deployment with that file.If you run more than 1 deployment for a specific job to the same location (docroot, server, db table, etc) that should change. If you submit 2000 files it breaks. Does that sound like a good design ?
Hmm - got up on the wrong side of the bed this morning Andy - or just tired of being called Ande ? (or maybe sorry you don't have a Mac?) :-)
So you think that having 2000 datadeploy calls for a single job is a good thing ?