I am working with a department who are using BPMN as a process modeling standard. They have modeled processes in another tool using the BPMN standard. This tool has XMI export so we were hoping to use the Provision XMI interface to load the existing process models into ProVision, and then hook them in to the wider business and enterprise architecture. However the other tool includes the BPMN "Intermediate Event". Provision BPMN and BPMN modeling languages do not have an "Intermediate Event". I've checked and the "Intermediate Event" is part of the BPMN standard.
Have other users come across this and how do you get around this?
By the way I've raised a support case 22851 to see if this is an ommision or by design, and if by design, what was the thinking. If an ommision I'm hoping it gets logged as a defect for urgent attention.
Thanks
Jim