HI
TS 7.3.2,
Windows 2008 R2 64 bit.
Im trying to Automate the Content Sync between 2 environments (Prod and UAT) by scheduling a deployment that would push the content from production to UAT Teamsite and then from there to Runtime. As far as the Livesite deployment that would work fine using the OD script. Im wondering about the LSCS deployment since one of the sites is using LSCS. Is there a way to do that with OD script or ot has to go with PLC/LSCS Workflow? anyone has done that or something similiar. Any guidance would be helpful
thanks in advance.