Form from Version 6.x Procedure Is Blank When Opened with 7.x Designer
The information in this article applies to: Product: Metastorm BPM (e-Work) Version: 6.x 7.x Issue * After migration to version 7.x, a version 6.x procedure is opened in the Designer and one of the forms is blank - all of the fields are missing. Resolution * This will happen if a form name in version 6.x contains a space…
-
Email Sent From yourname@yourcompany.com
The information in this article applies to: Product: Metastorm BPM Version: 6.x 7.x Issue * The Process Engine is sending mail, but it is shown as coming from -removed-. Resolution * This is the default address, which is normally changed by the user during installation. To change this after the Engine has been installed,…
-
Trust Computer for Delegation
The information in this article applies to: Product: Metastorm BPM Version: 7.x Issue * The Metastorm BPM Windows Single Sign-On guide refers to trusting the Metastorm BPM server (Engine server and web server) for delegation when configuring single sign-on (SSO) in a distributed environment using Kerberos. Is there a more…
-
Selection Disappears from Drop-Down Field
The information in this article applies to: Product: Metastorm BPM Version: 7.6.2 Issue * A drop-down field is populated by a label/value pair. The following are both checked for the field: Field is dependent on another Field has dependants of its own In the web client, not the Win32 client, when an item in the drop-down…
-
Integration Wizard Builds Incorrect Statement for %GetEntry
The information in this article applies to: Product: Metastorm BPM Version: 7.x Issue * If the Integration Wizard (IW) in the Process Designer is used to build a statement with %GetEntry, the syntax is incorrect. Depending on where the statement is used, this may cause a form to hang or prevent actions from being executed…
-
Methods and Properties of the Enterprise Component Library for Java
The information in this article applies to: Product: Metastorm BPM Version: 7.6 Issue * Is there a list of the methods and properties of the Enterprise Component Library (ECL) for Java? Resolution * Yes, this is provided in the Enterprise Component Library for Java Reference. It is available as a zip file from the…
-
Non-Latest Version of Library Cannot Be Selected When Procedure Is Opened
The information in this article applies to: Product: Metastorm BPM Version: 7.x Issue * When a procedure is opened in the Process Designer, only the latest version of an associated library can be opened with it. Thus, if one retrieves a previous version of a procedure from the database and it used version 1 of a library,…